NEW QUESTION # 49
In your plant, MRP is activated.
Which option do you have to exclude a materila from the MRP run?

  • A. Use a specific material group
  • B. Use a specific material status
  • C. Use specific MRP controller
  • D. Use a specific MRP type

Answer: A,C


NEW QUESTION # 50
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.
  • B. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
  • C. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements
  • D. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements

Answer: D


NEW QUESTION # 51
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?

  • A. The number of leading zeros for internal numbers is client-specific.
  • B. The maximum mater all number length is 40 for external numbers and 18 for internal numbers
  • C. In Customizing you can decide by material type whether to use the long material number.
  • D. The display template for material numbers applies to all clients.

Answer: B,D


NEW QUESTION # 52
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?

  • A. Specify a negative lanning horizon in the strategy profile.
  • B. Specify a negative offset time in the strategy profile.
  • C. Specify a positive planning horizon in the strategy profile.
  • D. Specify a positive offset time in the strategy profile.

Answer: B


NEW QUESTION # 53
How can you limit the validity of a bill of material (BOM)?

  • A. By plant
  • B. By industry
  • C. By material type
  • D. By period

Answer: A,D


NEW QUESTION # 54
Why would you use phantom assemblies?

  • A. To reduce the number of material masters
  • B. To reduce the number of changes required in bills of materials
  • C. To increase the number of planning levels
  • D. To make the assignment of components easier
  • E. To simplify the structure of bills of materials

Answer: B,D,E


NEW QUESTION # 55
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Consumption-based planning
  • B. Forecast planning
  • C. Manual planning without check
  • D. Material requirements planning

Answer: A


NEW QUESTION # 56
Which of the following is valid sequence of the main activities in production order processing?

  • A. Creation, release, printing, goods issue, confirmation, goods receipt
  • B. Creation, release, settlement, goods issue, confirmation, goods receipt
  • C. Creation, availability check, release, material widrawal, confirmation
  • D. Creation, printing, release, goods issue, confirmation, goods receipt

Answer: A,C


NEW QUESTION # 57
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

  • A. Material requirements planning
  • B. Backflushing
  • C. Production order release
  • D. Kanban

Answer: A


NEW QUESTION # 58
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.

  • A. Direction
  • B. Planning mode
  • C. Scheduling control
  • D. Finiteness level
  • E. Fixed pegging

Answer: A,B,C


NEW QUESTION # 59
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

  • A. Fill up based on the lot size procedure
  • B. Fill up to the reorder stock level
  • C. Fill up to the maximum stock level
  • D. Fill up to the safety stoc level

Answer: A


NEW QUESTION # 60
Which master data object governs the relationship between supply source and demand source in the Kanban process?

  • A. Replenishment strategy
  • B. Rate routing
  • C. Control cycle
  • D. Production supply area

Answer: C


NEW QUESTION # 61
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?

  • A. SAP SuccessFactors
  • B. SAP Ariba
  • C. SAP Fieldglass
  • D. SAP Concur
  • E. SAP Hybris

Answer: B,C,D


NEW QUESTION # 62
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?

  • A. MRP profile
  • B. Plants parameters
  • C. MRP controller
  • D. MRP group

Answer: D


NEW QUESTION # 63
Which time elements are relevant for lead time scheduling of a production order?

  • A. Planned delivery time
  • B. Setup time
  • C. Float after production
  • D. Total replenishment lead time

Answer: A,C


NEW QUESTION # 64
......