NEW QUESTION # 49
In your plant, MRP is activated.
Which option do you have to exclude a materila from the MRP run?
- A. Use a specific material group
- B. Use a specific material status
- C. Use specific MRP controller
- D. Use a specific MRP type
Answer: A,C
NEW QUESTION # 50
How would you define pegging in the context of Advanced Planning?
- A. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.
- B. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
- C. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements
- D. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
Answer: D
NEW QUESTION # 51
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?
- A. The number of leading zeros for internal numbers is client-specific.
- B. The maximum mater all number length is 40 for external numbers and 18 for internal numbers
- C. In Customizing you can decide by material type whether to use the long material number.
- D. The display template for material numbers applies to all clients.
Answer: B,D
NEW QUESTION # 52
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?
- A. Specify a negative lanning horizon in the strategy profile.
- B. Specify a negative offset time in the strategy profile.
- C. Specify a positive planning horizon in the strategy profile.
- D. Specify a positive offset time in the strategy profile.
Answer: B
NEW QUESTION # 53
How can you limit the validity of a bill of material (BOM)?
- A. By plant
- B. By industry
- C. By material type
- D. By period
Answer: A,D
NEW QUESTION # 54
Why would you use phantom assemblies?
- A. To reduce the number of material masters
- B. To reduce the number of changes required in bills of materials
- C. To increase the number of planning levels
- D. To make the assignment of components easier
- E. To simplify the structure of bills of materials
Answer: B,D,E
NEW QUESTION # 55
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Consumption-based planning
- B. Forecast planning
- C. Manual planning without check
- D. Material requirements planning
Answer: A
NEW QUESTION # 56
Which of the following is valid sequence of the main activities in production order processing?
- A. Creation, release, printing, goods issue, confirmation, goods receipt
- B. Creation, release, settlement, goods issue, confirmation, goods receipt
- C. Creation, availability check, release, material widrawal, confirmation
- D. Creation, printing, release, goods issue, confirmation, goods receipt
Answer: A,C
NEW QUESTION # 57
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
- A. Material requirements planning
- B. Backflushing
- C. Production order release
- D. Kanban
Answer: A
NEW QUESTION # 58
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.
- A. Direction
- B. Planning mode
- C. Scheduling control
- D. Finiteness level
- E. Fixed pegging
Answer: A,B,C
NEW QUESTION # 59
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A. Fill up based on the lot size procedure
- B. Fill up to the reorder stock level
- C. Fill up to the maximum stock level
- D. Fill up to the safety stoc level
Answer: A
NEW QUESTION # 60
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Replenishment strategy
- B. Rate routing
- C. Control cycle
- D. Production supply area
Answer: C
NEW QUESTION # 61
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?
- A. SAP SuccessFactors
- B. SAP Ariba
- C. SAP Fieldglass
- D. SAP Concur
- E. SAP Hybris
Answer: B,C,D
NEW QUESTION # 62
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?
- A. MRP profile
- B. Plants parameters
- C. MRP controller
- D. MRP group
Answer: D
NEW QUESTION # 63
Which time elements are relevant for lead time scheduling of a production order?
- A. Planned delivery time
- B. Setup time
- C. Float after production
- D. Total replenishment lead time
Answer: A,C