Pass Your C-TS422-2021 Exam at the First Try with 100% Real Exam Questions [Q30-Q49]

Share

Pass Your C-TS422-2021 Exam at the First Try with 100% Real Exam Questions

New SAP C-TS422-2021 Dumps & Questions Updated on 2023


SAP C-TS422-2021 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Outline both motivation and background of SAP S
  • 4HANA
  • Select and apply planning strategies, use the planning table
Topic 2
  • Determine master data objects for process orders
  • Introduction to SAP S
  • 4HANA Supply Chain Planning
Topic 3
  • Set up an order type, apply material staging and confirmation
  • Explain line load planning and confirmation
Topic 4
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Capacity Planning in SAP S
  • 4HANA
Topic 5
  • Identify repetitive manufacturing specific master data
  • Identify features for Good Manufacturing Practices (GMP)
Topic 6
  • Determine BOM item category, describe order status management and set user statuses
  • Material Requirements Planning in SAP S
  • 4HANA
Topic 7
  • Explain planning evaluation concepts
  • SAP User Experience strategy
Topic 8
  • Characterize process order elements and process order processing
  • Outline the basics and master data of advanced planning
Topic 9
  • Identify and explain production relevant master data
  • Configure availability check for components

 

NEW QUESTION 30
Which time elements are part of a routing operation?

  • A. Queue time
  • B. Float before production
  • C. Pick/pack time
  • D. Move time
  • E. Wait time

Answer: A,C,E

 

NEW QUESTION 31
How can SAP S/4HANA support a GMP-compliant production process?

  • A. Recipe approval
  • B. Digital signature
  • C. GMP-compliant flag
  • D. Batch record
  • E. Approved resources

Answer: A,B,D

 

NEW QUESTION 32
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag?

  • A. Production version
  • B. Work center
  • C. Material
  • D. Plant

Answer: B,C

 

NEW QUESTION 33
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?

  • A. Use the material where-used report.
  • B. Use the batch information cockpit.
  • C. Use batch determination.
  • D. Use the material staging report.

Answer: B

 

NEW QUESTION 34
Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing?

  • A. Material staging for nex order in sequence
  • B. Archiving of documents for assembly scrap
  • C. Reduction of associated capacity requirements
  • D. Posting of goods receipt for the product
  • E. Posting of production costs to the production cost collector

Answer: C,D,E

 

NEW QUESTION 35
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?

  • A. Capacity Requirements Planning (CRP)
  • B. Demand Planning (DP)
  • C. Material Requirements Planning (MRP)
  • D. Supply Network Planning (SNP)

Answer: C

 

NEW QUESTION 36
What happens to this dependent requirement when you convert the planned order into a production order?

  • A. They are converted into a reservation.
  • B. They are converted into a schedule line.
  • C. They are converted into a planned order.
  • D. They are converted into a production order.

Answer: A

 

NEW QUESTION 37
When can the automatic material availability check occur in a production order?

  • A. At order creation
  • B. At order confirmation
  • C. At order release
  • D. At order settlement

Answer: A,C

 

NEW QUESTION 38
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?

  • A. Run MRP with quota arrangement.
  • B. Run MRP with automatic selection of production version.
  • C. Assign planned orders manual lying the planning table.
  • D. Run PP/DS heuristics for repetitive manufacturing.

Answer: A,D

 

NEW QUESTION 39
Where do you maintain data to determine the duration of an operation for production?

  • A. Material master
  • B. Bill of material (BOM)
  • C. Work center
  • D. Routing

Answer: C,D

 

NEW QUESTION 40
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?

  • A. The last restrictive status
  • B. The cross-plant status
  • C. The plant-specific status
  • D. The most restrictive status

Answer: D

 

NEW QUESTION 41
What are the possible results of a production planning run in Advanced Planning (PP/DS)?

  • A. Production order
  • B. Purchase requistion
  • C. Planned order
  • D. Stock transport order
  • E. Scheduling agreement schedule line

Answer: B,C,E

 

NEW QUESTION 42
What is the purpose of collective orders?

  • A. To combine order management of co-products any by-products with the main product.
  • B. To manage production orders for an entire finished product on multiple levels
  • C. To post production costs on a cost collector instead of the production order
  • D. To post any component withdrawal as single backflush with order confiramtion

Answer: B

 

NEW QUESTION 43
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.
  • B. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
  • C. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements
  • D. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements

Answer: D

 

NEW QUESTION 44
Which SAP application can be used for forcasting in Supply Chain Planning?

  • A. Integrated Business Planning (IBP)
  • B. Supply Chain Management(SCM)
  • C. Capacity Requirements Planning (CRP)
  • D. Material Requirements Planning (MRP)

Answer: A,B

 

NEW QUESTION 45
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP planning file
  • B. MRP type
  • C. MRP controller
  • D. MRP group

Answer: C

 

NEW QUESTION 46
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?

  • A. Simultaneous
  • B. By usage probability
  • C. 100% check
  • D. First in first out (FIFO)

Answer: B,C

 

NEW QUESTION 47
What are the consequences if the Dispatched operation status is set for a production order operation?

  • A. You can reschedule the operation using midpoint scheduling in a planning table.
  • B. You can reschedule the order using infinite scheduling in a planing table
  • C. You can reschedule the operation using finite scheduling in planning table
  • D. You can reschedule the operation using lead time scheduling in a planning table

Answer: C,D

 

NEW QUESTION 48
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When alternate resources are used within one operation
  • B. When multiple planned orders exist on one resource
  • C. When multiple operations are maintained for one product
  • D. When multiple production versions are maintained for one product

Answer: A

 

NEW QUESTION 49
......


C-TS422-2021 Exam Certification Details:

Level:Associate
Languages:German, English, Japanese, Chinese
Sample Questions: SAP C-TS422-2021 Exam Sample Question

 

Updated Exam C-TS422-2021 Dumps with New Questions: https://getfreedumps.passreview.com/C-TS422-2021-exam-questions.html